Datacenter Image
3 Chome 9 Midoricho 180 0012 Musashino Japan
NTT DATA, Inc. (Tokyo 11)

Tokyo 11 is a large-scale, three-story data center situated on the stable Musashino Plateau, which minimizes risks from floods and earthquakes. The building features a seismic isolation system to ensure the continuous operation and protection of client equipment.

Technical Specifications

The data center has a total server room area of approximately 6,250 m² and a total building size of 26,000 m². It provides a critical IT load of 21 MW, with dual power feeds to each rack. The facility is equipped with an N+1 UPS redundancy system, offering 5 minutes of battery support. Standby power is provided by an N+1 diesel generator system, which can run for over 48 hours without refueling.

Connectivity and Cooling

Tokyo 11 is a carrier-neutral facility with multiple local carrier entry points connected through diversified paths. The cooling system uses both an indirect evaporative cooling system and a cooling wall system.

Security

Security is maintained by a 24/7 Security Operations Center and regular patrols. Access is controlled through CCTV surveillance, biometric scanners, and card access.

Services and Features

The data center offers various services, including full cabinets, partial cabinets, shared rackspace, cages, and suites. Remote hands service is also available. The maximum floor load is 2,000 kg/m².

Why Choose Tokyo Dc 9

Tokyo Dc 9 data center is built to meet the demands of modern enterprises, offering robust infrastructure, premium connectivity, and top-tier security. Whether you're deploying a single server or scaling to multiple racks, each facility is engineered for performance, reliability, and flexibility.

Tier III Certified

Redundant infrastructure with 99.99% uptime guarantee

Premium Connectivity

Multiple carrier options and low-latency connections

Advanced Security

Biometric access, 24/7 monitoring, and CCTV surveillance

Prime Location

Central Tokyo location with excellent transport links

Expert Support

Local technical team available 24/7 for remote hands

Scalable Solutions

From single rack to private cage configurations

Technical Specifications

Comprehensive infrastructure details for Tokyo Dc 9

Total Critical Power

21 MW

Indicates the maximum uninterrupted power capacity the facility can support during operation.

UPS Redundancy

N+1

Ensures continuous power supply via redundant UPS systems in case of failure.

Standby Power Redundancy

N+1

Supports critical systems with backup power sources during outages or maintenance.

CCTV Surveillance

Monitors premises in real-time for safety and compliance.

Biometric Access Control

Secures critical areas with fingerprint or retinal scanning systems.

Card Access Control

Allows controlled entry through RFID or magnetic access cards.

Total Whitespace

6,250 Sq.m.

Indicates available raised floor space for IT infrastructure.

Total Building Size

26,000 Sq.m.

Total structural area of the facility housing all infrastructure.

Key Performance Metrics

99.99%
Uptime SLA
21 MW
Total Power
24/7
Remote Hand Support

Our Colocation Plans

Want to get a custom quote?

Interested in this facility? Reach out to our team for specific pricing and availability.

contact us vector

Sales:

Take the first step and contact us. We begin every new conversation with a thorough vetting process to ensure we understand your needs and goals. This helps us align our products and services with your definition of success.

sales@colocationm.com