NexSpace has inaugurated its first data center located in the Heidelberg Innovation Park (HIP), Germany, marking a key milestone in advancing sustainable digital infrastructure. The facility is designed with energy efficiency and environmental responsibility at its core.
The three-story facility currently offers 2 MW of fully built-out power capacity supporting 4,000 square meters of live whitespace, with plans to expand the total whitespace to 8,000 square meters. The building accommodates full cabinets, partial cabinets, shared rackspace, and cages, providing flexible infrastructure options for various customer needs.
The data center achieves an impressive Power Usage Effectiveness (PUE) of 1.25, demonstrating its commitment to efficient energy consumption. It is connected to the local district heating network, enabling sustainable cooling solutions that minimize environmental impact.
Developed in partnership with Heidelberg municipal utilities and completed by the Data Center Group, this project strengthens Heidelberg's position as a hub for IT, artificial intelligence, and digital innovation. It offers modern infrastructure tailored for startups, research institutions, and businesses in the region.
NexSpace provides remote hands services, ensuring customers receive expert onsite support for hardware and operational tasks.
Why Choose Heidelberg Dc 1
Heidelberg Dc 1 data center is built to meet the demands of modern enterprises, offering robust infrastructure, premium connectivity, and top-tier security. Whether you're deploying a single server or scaling to multiple racks, each facility is engineered for performance, reliability, and flexibility.
Tier III Certified
Redundant infrastructure with 99.99% uptime guarantee
Premium Connectivity
Multiple carrier options and low-latency connections
Advanced Security
Biometric access, 24/7 monitoring, and CCTV surveillance
Prime Location
Central Heidelberg location with excellent transport links
Expert Support
Local technical team available 24/7 for remote hands
Scalable Solutions
From single rack to private cage configurations
Technical Specifications
Comprehensive infrastructure details for Heidelberg Dc 1
Total Critical Power
2 MWIndicates the maximum uninterrupted power capacity the facility can support during operation.
Total Whitespace
4000 Sq.m.Indicates available raised floor space for IT infrastructure.
Total Building Size
8000 Sq.m.Total structural area of the facility housing all infrastructure.
Key Performance Metrics
Our Colocation Plans
SINGLE SERVER
- Server Count: Single Server
- Rack Space: 1U, 2U, or 4U
- Power: 2-3 Amps, 120V AC
- Network Speed Port: 1Gbps
- 24/7 Support & Reboots: Yes
- Free Setup: Yes
QUATER RACK
- Rack Space: 1/4 Rack
- Specs: 10U, 17.5” Height
- Power: 5 Amps, 120V AC
- Network Speed Port: 1Gbps
- 24/7 Support & Reboots: Yes
- Free Setup: Yes
HALF RACK
- Rack Space: 1/2 Rack
- Specs: 21U, 36.75″ Height
- Power: 20 Amps, 120V AC
- Network Speed Port: 1Gbps
- 24/7 Support & Reboots: Yes
- Free Setup: Yes
FULL RACK
- Server Count: Upto 42 Servers
- Specs: 42U, 73.50″ Height
- Power: 20+ Amps, 120V AC
- Network Speed Port: 1Gbps
- 24/7 Support & Reboots: Yes
- Free Setup: Yes
Want to get a custom quote?
Interested in this facility? Reach out to our team for specific pricing and availability.
Sales:
Take the first step and contact us. We begin every new conversation with a thorough vetting process to ensure we understand your needs and goals. This helps us align our products and services with your definition of success.
sales@colocationm.com